To fill out this form, first ensure you have all required customer information ready. Next, gather necessary supporting documentation, including the single line diagram and system justification forms. Finally, review for accuracy before submission to avoid delays.

imageSign

How to fill out the SCE Interconnection NEM 2.0 Application Guide?

  1. 1

    Gather required customer information and documents.

  2. 2

    Ensure all fields in the application are accurately completed.

  3. 3

    Include supporting documents like single line diagrams.

  4. 4

    Double-check for any major deficiencies mentioned.

  5. 5

    Submit the completed application before the deadline.

Who needs the SCE Interconnection NEM 2.0 Application Guide?

  1. 1

    Residential customers applying for solar projects.

  2. 2

    Businesses looking to expand their energy generation.

  3. 3

    Contractors aiding clients in submitting interconnection requests.

  4. 4

    Developers who need to understand NEM 2.0 requirements.

  5. 5

    Energy storage project managers submitting for PTO.

How PrintFriendly Works

At PrintFriendly.com, you can edit, sign, share, and download the SCE Interconnection NEM 2.0 Application Guide along with hundreds of thousands of other documents. Our platform helps you seamlessly edit PDFs and other documents online. You can edit our large library of pre-existing files and upload your own documents. Managing PDFs has never been easier.

thumbnail

Edit your SCE Interconnection NEM 2.0 Application Guide online.

Easily edit this PDF on PrintFriendly by clicking the 'Edit' button on the toolbar. You can fill in the required fields and make updates to any information as needed. Save your changes by downloading the updated file after editing.

signature

Add your legally-binding signature.

Signing the PDF on PrintFriendly is simple; just select the 'Sign' option in the toolbar. You can add your signature electronically with a few clicks. After signing, download your finalized document for your records.

InviteSigness

Share your form instantly.

You can share the PDF directly from PrintFriendly using the 'Share' feature. Send it via email or get a shareable link to distribute to others. Collaborate easily by sharing the document with colleagues or clients.

How do I edit the SCE Interconnection NEM 2.0 Application Guide online?

Easily edit this PDF on PrintFriendly by clicking the 'Edit' button on the toolbar. You can fill in the required fields and make updates to any information as needed. Save your changes by downloading the updated file after editing.

  1. 1

    Open the PDF in PrintFriendly and select 'Edit'.

  2. 2

    Fill in the necessary fields with accurate information.

  3. 3

    Check for any required documentation needed for your project.

  4. 4

    Make final adjustments and ensure all information is correct.

  5. 5

    Download the edited PDF for submission.

What are the instructions for submitting this form?

To submit this form, complete all required fields accurately, ensuring you include the customer’s legal name and correct account details. You can email the completed form to SCE’s dedicated submission email or use the online application portal provided on their website. For physical submissions, ensure the application is sent to the designated address listed in the guidelines.

What are the important dates for this form in 2024 and 2025?

Ensure you adhere to important deadlines related to NEM 2.0, particularly the application deadline of April 14, 2023, for eligibility. Future modifications and eligibility for further applications will be defined as per updates in regulatory timelines leading into 2024 and 2025.

importantDates

What is the purpose of this form?

The purpose of this form is to facilitate the application process for interconnection under the NEM 2.0 program. It aims to clarify eligibility requirements and submission guidelines for both customers and contractors. By standardizing this process, SCE ensures that all applications are evaluated consistently and efficiently.

formPurpose

Tell me about this form and its components and fields line-by-line.

The interconnection application form consists of several critical fields that must be accurately filled.
fields
  • 1. Customer Name: The legal name of the customer applying.
  • 2. Service Account Number: Unique identifier for the customer's SCE account.
  • 3. Address: The physical location where service is provided.
  • 4. System Size: The capacity of the proposed solar energy system.
  • 5. Email: Contact email for communication regarding the application.

What happens if I fail to submit this form?

Failure to submit this form correctly may result in delays or disqualification from NEM 2.0 eligibility. Ensure all fields are properly filled and all required documentation is included.

  • Delayed Approval: Incomplete applications can cause significant delays in processing.
  • Ineligibility for Benefits: Failure to meet submission guidelines may result in loss of eligibility for incentives.
  • Increased Costs: Reworking applications due to deficiencies can incur additional costs and fees.

How do I know when to use this form?

Use this form when you are ready to submit an interconnection request for your solar project under NEM 2.0. It's necessary for both residential and commercial applications. Be mindful of application deadlines and required documentation.
fields
  • 1. Residential Solar Projects: Homeowners seeking to install solar can use this form for NEM 2.0.
  • 2. Commercial Energy Users: Businesses looking to expand renewable energy solutions should submit this application.
  • 3. Contractors and Installers: Contractors helping clients must familiarize themselves with this form for proper submission.

Frequently Asked Questions

How do I ensure my application is valid?

Submit a NEM application that is free of major deficiencies by the deadline.

What are major deficiencies?

Major deficiencies include inaccurate customer information and incomplete applications.

How long is my application valid for NEM 2.0?

Applications deemed valid retain eligibility for up to three years.

What is considered a material modification?

Any proposed change that affects the system size or equipment components.

Can I resize my system after applying?

You may adjust your system size within specified limits without losing eligibility.

How does the Solar Billing Plan affect my project?

Oversizing is allowed up to 150% of the historical usage under the new plan.

What if my application is returned?

Follow submission guidelines closely to prevent applications from being returned.

Are there exceptions to the application requirements?

Minor deficiencies may not disqualify your project based on the guidelines.

How do I submit my application?

Applications can be submitted online, via email, or by fax.

What resources can help me with my application?

Refer to SCE guides and FAQs for additional support as needed.