Net Energy Metering and Net Billing Tariff Application
This document is the application form for PG&E's Net Energy Metering (NEM/NEM2) and Net Billing Tariff (NBT) Interconnection for solar and/or wind electric generating facilities of 30 kW or less. It includes necessary customer and system information, interconnection types, system ownership details, contractor information, and description of generating facilities. Instructions also cover variances from Distribution Interconnection Handbook and Greenbook requirements.
Edit, Download, and Sign the Net Energy Metering and Net Billing Tariff Application
Form
eSign
Add Annotation
Share Form
How do I fill this out?
To fill out this application, gather all necessary information including your PG&E account details, type of interconnection, and details about the generating system and ownership. Carefully complete all sections applicable to your situation. Make sure to provide accurate and complete data to avoid any delays in processing.

How to fill out the Net Energy Metering and Net Billing Tariff Application?
1
Collect your PG&E account details and meter number.
2
Determine the type of interconnection and ownership details.
3
Complete the sections with customer, system, and contractor information.
4
Fill in the rebate and building code-required solar installation details.
5
Submit the completed form to PG&E as instructed.
Who needs the Net Energy Metering and Net Billing Tariff Application?
1
Customers looking to interconnect solar or wind generating facilities of 30 kW or less with PG&E.
2
Property owners who participated in a California rebate program and need to indicate rebate details.
3
Contractors responsible for the installation of generating facilities.
4
Homeowners using Property Assessed Clean Energy (PACE) financing for their solar or wind systems.
5
Third-party system owners needing to provide details about financial institutions or developers.
How PrintFriendly Works
At PrintFriendly.com, you can edit, sign, share, and download the Net Energy Metering and Net Billing Tariff Application along with hundreds of thousands of other documents. Our platform helps you seamlessly edit PDFs and other documents online. You can edit our large library of pre-existing files and upload your own documents. Managing PDFs has never been easier.

Edit your Net Energy Metering and Net Billing Tariff Application online.
Edit this PDF on PrintFriendly by using our intuitive PDF editor. Quickly update any field with the necessary information, including account details, system specifications, and contractor data. Easily make corrections and additions directly on the form without needing to download any extra software.

Add your legally-binding signature.
Sign this PDF on PrintFriendly using our integrated e-signature feature. After completing the form, simply click the sign button to add your signature. Ensure the signed document is ready for submission without printing.

Share your form instantly.
Share this PDF on PrintFriendly directly via email or a shareable link. Use our sharing feature to quickly send the completed application to PG&E or other stakeholders. Make the submission process seamless and paperless.
How do I edit the Net Energy Metering and Net Billing Tariff Application online?
Edit this PDF on PrintFriendly by using our intuitive PDF editor. Quickly update any field with the necessary information, including account details, system specifications, and contractor data. Easily make corrections and additions directly on the form without needing to download any extra software.
1
Open the PDF in PrintFriendly's editor.
2
Select the text field you need to update.
3
Input the necessary information or corrections.
4
Use our tools to add any additional details or comments.
5
Save and finalize your edits for download or sharing.

What are the instructions for submitting this form?
To submit the completed form, email it to intercon@pge.com, fax it to 415-973-6400, or mail it to PG&E Energy Solutions and Service, 245 Market Street, Mail Code N9V, San Francisco, CA, 94105. Online submissions can be made at www.pge.com/gen. For best results, ensure all sections are accurately filled and the required documentation is attached.
What are the important dates for this form in 2024 and 2025?
The application is effective starting March 1, 2023. Ensure to check for any updates about the form in the respective sections for years 2024 and 2025.

What is the purpose of this form?
The purpose of this form is to facilitate the interconnection of solar and/or wind electric generating facilities of 30 kW or less with PG&E's system under Net Energy Metering (NEM/NEM2) and Net Billing Tariff (NBT) plans. It collects essential data about the customer, system type, interconnection requirements, and contractor involved. Ensuring all information is accurately provided helps in the timely approval and operational setup of your energy-generating system.

Tell me about this form and its components and fields line-by-line.

- 1. Customer and Generating Facility Information: Includes electric service agreement ID and meter number.
- 2. Interconnection Application Type: Options to select the type of interconnection, such as new or modifications to existing facilities.
- 3. System Owner: Details about system ownership, including PACE financing and payment amounts.
- 4. Contractor Information: Lists contractor details including company name, license number, address, and contact information.
- 5. Generating Facilities Description: Indicates whether the project meets the standards or requires a variance request.
What happens if I fail to submit this form?
Failure to submit the form can delay or prevent the system's interconnection to PG&E's network, risking service disruption.
- Service Delay: Interconnection may be delayed, affecting the planned operational date.
- Non-Compliance: The generating facility could be non-compliant with regulatory requirements.
How do I know when to use this form?

- 1. New Interconnection: For new installations of generating facilities of 30 kW or less.
- 2. System Modification: When modifying an existing generating facility's interconnection.
Frequently Asked Questions
How do I fill out the PG&E NEM/NBT Application form on PrintFriendly?
Use our PDF editor to enter your PG&E account details, interconnection type, and generating facility information. Complete all relevant fields.
Can I update incorrect information on the application form?
Yes, you can easily update any incorrect information directly in the PDF using our editor.
How can I add my signature to the application form?
You can add your signature using PrintFriendly's integrated e-signature feature, ensuring the form is ready for submission.
Can I share the completed form through PrintFriendly?
Yes, you can share the completed form via email or a shareable link using PrintFriendly's sharing feature.
Do I need to download additional software to edit the PDF?
No, PrintFriendly's PDF editor works directly in your browser, eliminating the need for additional software.
What details are required in the contractor information section?
You will need the contractor's company name, license number, address, email, phone number, and Home Improvement Salesperson (HIS) registration number if applicable.
How do I indicate a rebate program in the form?
In the rebate information section, indicate the rebate program name and the amount received.
How can I specify ownership details in the application?
In the system owner section, specify whether the system is owned by the PG&E customer or a third party and provide relevant details.
Can I edit the form multiple times?
Yes, you can save your progress and return to edit the form as many times as needed.
Is there a way to preview the completed form before submission?
Yes, use the preview feature in PrintFriendly to review your completed form before finalizing and submitting it.