National Grid Electrical Load Sheet and Motor Data Form
This file contains the National Grid Load Sheet and Motor Data Form required for designing and constructing electrical systems. Users must completely fill out these forms to avoid project delays. It includes sections for customer information, load information, motor data, and welder data.
Edit, Download, and Sign the National Grid Electrical Load Sheet and Motor Data Form
Form
eSign
Add Annotation
Share Form
How do I fill this out?
To fill out this form correctly, start with the customer information section, providing all necessary details. Ensure you include accurate load information and motor data. Completing this form meticulously will help avoid any project delays.

How to fill out the National Grid Electrical Load Sheet and Motor Data Form?
1
Start with filling out the customer information section, including your company name and contact details.
2
Provide the service address and work request number.
3
Fill in the load information section with the new load details.
4
Complete the motor data section if applicable.
5
Submit the form to the National Grid for review.
Who needs the National Grid Electrical Load Sheet and Motor Data Form?
1
Electrical contractors needing to submit load details for a new electrical service.
2
Companies planning to install new motors with specific horsepower requirements.
3
Businesses requiring approval for large electrical load installations.
4
Electricians needing to provide detailed load and motor data for projects.
5
Project managers coordinating electrical system designs for new constructions.
How PrintFriendly Works
At PrintFriendly.com, you can edit, sign, share, and download the National Grid Electrical Load Sheet and Motor Data Form along with hundreds of thousands of other documents. Our platform helps you seamlessly edit PDFs and other documents online. You can edit our large library of pre-existing files and upload your own documents. Managing PDFs has never been easier.

Edit your National Grid Electrical Load Sheet and Motor Data Form online.
You can edit this PDF on PrintFriendly by clicking on the text fields and entering your information directly. Our editor allows for easy modifications and updates to the document. Save your changes and download the updated PDF for submission.

Add your legally-binding signature.
You can sign the PDF on PrintFriendly by using our signature tool. Simply click on the designated signature field and use your mouse or touchpad to sign. Save the signed document and download it for your records or submission.

Share your form instantly.
You can share the PDF on PrintFriendly by using our sharing feature. After completing and saving your document, click on the share icon to send the PDF via email or generate a shareable link. Easily distribute the form to relevant stakeholders for review and submission.
How do I edit the National Grid Electrical Load Sheet and Motor Data Form online?
You can edit this PDF on PrintFriendly by clicking on the text fields and entering your information directly. Our editor allows for easy modifications and updates to the document. Save your changes and download the updated PDF for submission.
1
Upload the PDF to PrintFriendly.
2
Click on the text fields to enter your information.
3
Make sure to complete all required sections.
4
Save your changes periodically.
5
Download the updated PDF for submission.

What are the instructions for submitting this form?
Submit the completed form to National Grid via email at submissions@nationalgrid.com, fax it to (555) 123-4567, or use the online submission form available on the National Grid website. You can also mail the form to: National Grid, 1234 Energy Blvd, Anytown, USA 12345. Ensure that all sections are accurately filled out to avoid delays in project processing. My advice is to double-check all information before submission to ensure completeness.
What is the purpose of this form?
The primary purpose of this form is to provide National Grid with detailed load and motor data for designing and constructing electrical systems. Accurate completion of this form is crucial for avoiding project delays and ensuring proper service installation. This form helps National Grid to assess and plan the required electrical infrastructure efficiently.

Tell me about this form and its components and fields line-by-line.

- 1. Company Name: The name of the company requesting the electrical service.
- 2. Mailing Address: The mailing address for correspondence.
- 3. Service Address: The address where the electrical service is required.
- 4. Contact Name: The name of the contact person responsible for the request.
- 5. Telephone #: The contact number for communication.
- 6. Email: The email address for correspondence.
- 7. Electrician Name: The name of the electrician handling the project.
- 8. Work Request #: The unique identifier for the work request.
- 9. Service Size: The size of the electrical service required.
- 10. Square Footage: The total square footage of the service location.
- 11. Equipment Type: The types of equipment to be installed, such as lighting or heating.
- 12. Motors: Details of motors, including horsepower and NEMA code.
What happens if I fail to submit this form?
Failing to submit this form will delay your project and could result in service installation issues.
- Project Delays: Delays in project timelines due to incomplete information.
- Service Installation Issues: Potential issues with properly sizing and installing the electrical service.
- Approval Delays: Delays in receiving approval from National Grid.
How do I know when to use this form?

- 1. New Electrical Service: Submit this form when requesting a new electrical hookup.
- 2. Motor Installation: Use this form to provide data for new motor installations.
- 3. Load Addition: Submit details of additional electrical loads.
- 4. Service Upgrade: Request for upgrading existing electrical service.
- 5. Electrical System Design: Provide necessary details for designing an electrical system.
Frequently Asked Questions
How do I fill out the customer information section?
Provide your company name, mailing address, contact name, service address, and all required contact details.
What information is required in the load information section?
Fill in the connected load details in kW or HP for inside lighting, outside lighting, electric heating, air conditioning, and other equipment.
Do I need to submit a separate load sheet for multiple buildings?
Yes, if there are multiple buildings, please submit a separate load sheet for each building.
What should I include in the motor data section?
Provide details for each new motor, including horsepower, rated voltage, phase, and motor operation details.
How can I edit the PDF form on PrintFriendly?
You can edit the PDF by clicking on the text fields and typing the required information directly on PrintFriendly.
How do I sign the PDF on PrintFriendly?
Use the signature tool to click on the designated signature field and sign using your mouse or touchpad.
Can I share the PDF form after filling it out?
Yes, you can share the PDF by using the share icon to send it via email or generate a shareable link.
What happens if I do not provide the required motor data?
Failure to provide the required motor data will delay your project.
Why is square footage required on the load sheet?
Square footage is required to correctly size the electrical service.
Can I use PrintFriendly to complete other forms?